1.Use orange line segment to find slope of diagonal linear section of green plot.
2.Use orange line segment to create tangent line at t = 2.8 s on green plot, find slope.
3.Use orange lie segment to find maximum acceleration using blue plot.
4.Taking the blue plot to be a trapezoid, determine its area.
5.Can acceleration be determined from green plot?